It looks like Fortis installed the first smart meter concentrator here yesterday.
Advanced metering infrastructure (AMI) requires a medium to provide continuous point-to-point communication connectivity. Your smart meter (to be installed next week) needs to connect to an aggregation node and have a data uplink to the AMI Control center. Typically, a local AMI system includes smart meters and data concentrators. Also, each smart meter can serve as a hub or repeater for other smart meter communication with data concentrators.
There are more steps to the whole chain. Obviously what starts at your meter will have to end up in a Fortis control centre. The equipment shown here, located on Main Street, will have backhaul communication. It could connect to satellite or possibly the China Creek Internet tower. §